National Underpinning
A technician in PPE injecting resin through a small port at the base of a brick wall, close range, photoreal.
National Underpinning

Resin injection underpinning

Structural resin injected through small ports below the foundation. The resin expands, fills voids, and stiffens weak soil.

  • UK-wide coverage and local knowledge
  • 20 year remedial warranty
  • Diagnostics to remedial work

What it is

A two-part polyurethane resin is delivered through narrow tubes pushed beneath the footing. As it reacts it expands, displacing air and water from loose soil, then sets to a defined strength within minutes.

Pressure and lift are monitored at the wall with laser levels. Injection happens in stages, with continuous feedback so the engineer can stop before any unwanted lift occurs. The whole job is dry, no excavation, no spoil, no exposed footings.

Resin systems are tested to BBA certification and used widely across Europe. They are not a magic fix for every subsidence problem, but in the right ground they are genuinely as effective as traditional underpinning at a fraction of the disruption.

When it's used

Resin injection fits shallow subsidence in granular soils where the foundation is structurally sound but the soil beneath it has lost density. The classic trigger is a leaking drain washing fines out from under a strip footing on sandy or silty ground, often discovered after a CCTV survey done for unrelated reasons. It is also the right tool for filling voids beneath foundations after washouts, for stabilising lightly loaded slabs, and for properties where excavation is genuinely impossible: paved courtyards, conservatory floors, internal slabs in occupied homes. The whole job is dry, dust-controlled, and usually finished in a day on site.

Resin treats the soil, not the foundation. If the footing itself has cracked, rotated, or sheared, no amount of resin will rebuild it; the right answer there is mass concrete, beam and base, or piles. Plastic clays (where most UK subsidence actually happens) are a poor fit because resin cannot stop a tree drinking next summer. The two questions worth answering before signing off resin are simple: what is the soil, and is the failure in the foundation or in the ground under it? A trial pit and a soil log give the answer in a day, and it is the cheapest money you will spend on the whole job.

How the work runs

  1. 1. Ground investigation

    Trial pits and probes confirm the depth and nature of the weak layer.

  2. 2. Injection grid

    Ports installed at planned intervals along the affected wall.

  3. 3. Controlled lift

    Resin injected in stages while the wall is monitored for movement.

Pros and cons

Pros

  • No excavation, work completes in a single day for most domestic jobs
  • Minimal disruption to gardens, driveways, and finishes
  • Real-time monitoring of lift and pressure
  • Cheaper per metre than traditional methods in suitable ground
  • Property remains habitable throughout

Cons

  • Not suitable in plastic clays (where most UK subsidence happens)
  • Cannot rebuild a failing foundation, only stiffens the soil
  • Some loss adjusters still prefer concrete-based solutions
  • Requires good ground investigation to specify correctly

How it compares

Every method we offer at a glance.

Method Time on site Reaches Disruption Best for
Beam and base 2 to 6 weeks Up to 4m via deeper bases High, large pits with significant excavation Variable ground, bay windows, redistributing loads
Foam injection 1 day for most jobs Treats soil and slabs to 3m Minimal, drilled ports only Slab re-levelling, void fill, conservatory bases
Mass concrete 2 to 6 weeks per elevation Up to 3m hand-dug High, open excavation and significant spoil Shallow failures on traditional ground, insurance claims
Mini piled 1 to 3 weeks on site 10–15m, sometimes more Medium, compact rigs and internal floor lifts Deep bearing layers, made-up ground, restricted access
Resin injection 1 day for most jobs Treats soil to 3–4m via ports Minimal, small ports and no spoil Granular soils, intact foundations, voids and density loss
Screw pile 2 to 5 days 5–10m typical Low, no excavation and no concrete cure Lighter loads, time-critical jobs, conservatories

Suitability

Copes well with sandy and silty soils that have lost density, with shallow voids beneath foundations, and with slabs needing modest re-levelling. Struggles with plastic clays, deep failures, active heave, and any case where the foundation itself has failed structurally. The diagnostic questions are: is the soil granular enough for the resin to densify it, and is the foundation sound enough to ride on the improved ground? If both answers are yes, resin is genuinely as effective as traditional underpinning at a fraction of the disruption.

Common questions

Get a free assessment

A surveyor will be in touch within 48 hours.

Get a free assessment